-
Refitting of OLP Exhibition Centre
The project included work to replace and repair existing electromechanical installations and construct new ones at the OLP SA Exhibition Centre, a total area of 24,000.00m2.
• Replacement and repair of water supply and sewage systems.
• Replacement and repair of electrical fittings (piping, cabling, replacement of lights, replacement of electrical panels, etc).
• Work to install new air-conditioning in the building (piping and air ducts, installation of central and local air-conditioning units, installation of heat pumps, etc).
• Installation of new boiler-rooms for heating and air-conditioning.
Project OwnerO.L.P. SA.
Group CompanyKL. G. ROUTSIS SA
-
Photos

