KGR

T210 68 56 125F210 68 51 158Einfo@kgrgroup.gr
GR EN
  • The Alexandreio Sports Melathron in Thessaloniki

    • Work to strengthen the structure of the stadium with carbon fibre laminate and carbon fibre fabric.

    • Repairs – replacements of rust, decay and local peeling on visible concrete surfaces with special rust inhibitors and anti-corrosive plaster.

    • Replacement of corrosion – rust on metal mesh supporting the seat-bearing girders and protecting it with special rust inhibitors.

    • Repairs – replacements of brickwork and paint in main and auxiliary areas (locker-rooms, washrooms, etc).

    • Repairs – replacements of ceramic tiled floor surfaces (utility areas and canteens).

    • Replacement of existing floors in most of the main areas in the stadium.

    • Replacement of false ceilings in most of the main utility areas in the stadium.

    • Replacement of internal and external doors.

    • Replacement of windows.

    • Maintenance or replacement of existing railings.

    • Replacement of stadium seating.

    • Repainting throughout the stadium.

    • Replacement of signage in the stadium.

    • Other similar work for redeveloping the facilities.

    Β) Electromechanical work

    • Maintenance or replacement of water supply and sewage systems.

    • Maintenance or replacement of equipment in sports and utility areas (locker-rooms, washrooms, etc).

    • Maintenance or replacement of strong and weak current installations.

    • Maintenance, replacement and technical management of lighting, electrical panels and lighting installations on the field.

    • Maintenance, replacement and technical management of air-conditioning in the stadium.

    • Other similar maintenance – redevelopment work in the facilities.

    Project Owner

    MIN. OF CULTURE / GEN. SEC. OF SPORTS (GGA)

    Group Company

    KL. G. ROUTSIS SA

  • Photos