KGR

T210 68 56 125F210 68 51 158Einfo@kgrgroup.gr
GR EN
  • Road construction in Perama

    This study concerns work to open up and construct Kolokotroni Street from Agias Lavras Street in an easterly direction, a length of 145.00m, including the construction of a wastewater drainage system in the street as well as in Ikaron Street (north on Kolokotroni Street). The drainage of stormwater runoff has also been planned with the installation of a PVC Φ400 overflow pipe.

    Project Owner

    MUNICIPALITY OF PERAMA

    Group Company

    SKOPINAS ΟΕ.

  • Photos