-
Road construction in Perama
This study concerns work to open up and construct Kolokotroni Street from Agias Lavras Street in an easterly direction, a length of 145.00m, including the construction of a wastewater drainage system in the street as well as in Ikaron Street (north on Kolokotroni Street). The drainage of stormwater runoff has also been planned with the installation of a PVC Φ400 overflow pipe.
Project OwnerMUNICIPALITY OF PERAMA
Group CompanySKOPINAS ΟΕ.
-
Photos

