Exploitation of dam on rivers in Rethymni – Construction of tunnel
The project consisted of the construction of a tunnel totaling a length of 3,340.00m and with a final cross-section of 13.00m2. In addition, a drainage tunnel was constructed in the right-hand dam buttress and a bung to stop up the diversion tunnel.
Project OwnerWESTERN CRETE DEVELOPMENT ORGANIZATION (Ο.Α.DΥ.Κ.)
Group CompanyKL. G. ROUTSIS SA
-