  • Water supply in Salamis

    The approved feasibility study includes:

    • The complete construction of an onshore pipeline in Attica along the old Athens – Corinth National Road. The length of the onshore section totals 4,900.00m (3,480.00m Φ1000, 1,390.00m Φ800, 25.00m Φ500 in two branches constituting the starting-point of the twin undersea HDPE Φ560 pipeline).

    • The complete construction of a twin undersea HDPE Φ560 pipeline connecting Attica – Salamis in the Nea Perama – Faneromeni sound at a maximum depth of 9.00m. The length of the pipe is 825.00m.

    • The complete construction of an onshore Φ800 steel pipeline on the island of Salamis with a length of 7,300.00m.

    Project Owner

    THE WATER SUPPLY & SEWERAGE COMPANY (EYDAP)

    Group Company

    KL. G. ROUTSIS SA